home *** CD-ROM | disk | FTP | other *** search
/ Skunkware 5 / Skunkware 5.iso / tls / tls029.1.Z / tls029.1 / industry / 1098 < prev    next >
Encoding:
Text File  |  1994-04-19  |  793 b   |  19 lines

  1. Chameleon 2000 Rough Cut Capacity Planning - Tetra Ltd.
  2.  
  3. KEYWORDS: manufacturing, Manufacturing                           , 44 
  4.  
  5. The Rough Cut Capacity Planning module creates an outline production plan based
  6. on the details held in the integrated Chameleon 2000 manufacturing modules and
  7. checks the feasibility of the Master Production Schedule. There is an option to
  8. include or exclude setup and delay times. It provides early warning of
  9. bottlenecks and under-utilisation of work centres or skill groups, and will
  10. automaticlaly create a standard capacity if no capacity record exists. Work-to
  11. lists for skill groups and work centres can be produced and sorted by date or
  12. resource. Full enquiry and reporting facilities are available.
  13.  
  14.  
  15.  
  16. Tetra Ltd.
  17. Tel: (44) 0628 770939
  18. Fax: (44) 0628 770378
  19.